關(guān)于旋轉(zhuǎn)供料器的安裝
Regarding the installation of the rotary feeder

(一)安裝旋轉(zhuǎn)供料器時(shí),要考慮留出足夠的維修空間,防止日后檢修麻煩。
?。?) When installing the rotary feeder, sufficient maintenance space should be considered to prevent future maintenance troubles.
?。ǘ?旋轉(zhuǎn)供料器是精密設(shè)備,嚴(yán)禁將上部設(shè)備壓力及連接管道的壓力等傳遞給主機(jī)設(shè)備身上。
?。?) The rotary feeder is a precision equipment, and it is strictly prohibited to transmit the pressure of the upper equipment and connecting pipelines to the main equipment.
?。ㄈ┰谡龎簹饬斔蛻?yīng)用中旋轉(zhuǎn)供料器的抽氣室必須要安裝。
?。?) The suction chamber of the rotary feeder must be installed in positive pressure pneumatic conveying applications.
?。ㄋ模┮紤]高溫物料的熱膨脹對(duì)旋轉(zhuǎn)供料器連接影響,使之降到最低,可以使用補(bǔ)償器,或一段直管作為銜接部分。
?。?) To minimize the impact of thermal expansion of high-temperature materials on the connection of the rotary feeder, compensators or a straight pipe can be used as a connecting part.
?。ㄎ澹?設(shè)備內(nèi)部的噴吹及氣封裝置應(yīng)設(shè)置必要的減壓裝置和氣量調(diào)節(jié)裝置,確保氣體的品質(zhì)符合要求,壓力設(shè)置在規(guī)定范圍內(nèi)。
?。?) The spraying and sealing devices inside the equipment should be equipped with necessary pressure reducing devices and gas volume regulating devices to ensure that the quality of the gas meets the requirements and the pressure is set within the specified range.
空載狀態(tài)運(yùn)轉(zhuǎn)試機(jī)
Test run under no-load condition
?。ㄒ唬z查配管,檢查是否有無(wú)雜物進(jìn)入設(shè)備內(nèi)部,有雜物必須清理干凈。
(1) Inspect the piping and check for any debris entering the interior of the equipment. Any debris must be cleaned thoroughly.
?。ǘ⑿D(zhuǎn)供料器安裝并配管完畢后,確認(rèn)電源就位關(guān)閉狀態(tài)。
?。?) After installing and piping the rotary feeder, confirm that the power is in place and turned off.
?。ㄈ?、卸下傳動(dòng)鏈安全罩和傳動(dòng)鏈條。
?。?) Remove the transmission chain safety cover and transmission chain.
?。ㄋ模?、用手轉(zhuǎn)動(dòng)旋轉(zhuǎn)閥,確認(rèn)閥門順暢回轉(zhuǎn)。
?。?) Rotate the rotary valve by hand to confirm that the valve rotates smoothly.
(五)、確認(rèn)配管已全部連接正常。
?。?) Confirm that all piping connections are functioning properly.
?。⒋_認(rèn)齒輪傳動(dòng)馬達(dá)已將潤(rùn)滑油補(bǔ)充至制造廠家使用說(shuō)明書指示的水平(正常情況設(shè)備出廠已經(jīng)加注完畢)。
?。?) Confirm that the lubricating oil for the gear transmission motor has been replenished to the level indicated in the manufacturer's instruction manual (under normal circumstances, the equipment has already been filled before leaving the factory).
(七)、確認(rèn)安全罩已經(jīng)裝好。
?。?) Confirm that the safety cover has been installed.
?。ò耍⒋_認(rèn)回轉(zhuǎn)方向。
?。?) Confirm the direction of rotation.
?。ň牛?、確認(rèn)以上各項(xiàng)不存在問(wèn)題后,進(jìn)行十五分鐘空載運(yùn)轉(zhuǎn)。
?。?) After confirming that there are no issues with the above items, perform a fifteen minute no-load operation.
(十)、如果在空轉(zhuǎn)時(shí)沒(méi)有震動(dòng)與雜音,則表示設(shè)備正常,可停止空轉(zhuǎn)狀態(tài)。
?。?0) If there is no vibration or noise during idling, it indicates that the equipment is normal and can be stopped from idling.
本文由 旋轉(zhuǎn)供料器 友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊 http://m.iyouth-china.com/ 真誠(chéng)的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.
This article is a friendly contribution from the rotating feeder For more related knowledge, please click http://m.iyouth-china.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Stay tuned
聯(lián)系電話
二維碼